PGMC Project

Posted on Posted in Mining

Project Name: Cagdianao Nickel Mine Project
Client: Platinum Group Metals Corporation (PGMC)
Date Started: March 2014 – December 2015
Address: Sitio Kinalablaban, Brgy. Cagdianao, Claver, Surigao del Norte

Contact Person: Engr. Corsino L. Odtojan
Contact Number: +63 917 527 0127

FRÁSEC Ventures Corporation (FVC) was the General Contractor of CAGA-2 Mineral Tenement of PGMC. The scope of works involves waste stripping, extraction, hauling, stockpiling, beneficiation, rolling and sundrying, barging, shipside-loading of direct shipping nickel ores; road construction and maintenance; jetty construction and maintenance and environmental works. Monthly production and shipment tonnage target was an average of 500,000 wet metric tons. FVC operated and managed a fleet of approximately 500 heavy equipment and employs close to 2,000 personnel.

The project has shipped Direct Shipping Ores (DSO) to China with more than 3,000,000 WMT of nickel ores since March 2014.