Featured Projects
FRÁSEC Ventures Corporation delivers high-quality standards across a diverse portfolio, specializing in comprehensive commercial and residential construction as well as aggregates production and supply. From critical structural formworks to massive mining, quarrying, and mineral extraction operations nationwide, we consistently provide the human resources and equipment required to exceed client expectations.

Pacific Nickel Philippines Inc.
Nonoc Island, Surigao City, Surigao del Norte
July 2007 – December 2015
Scope of Work
General Contractor (1,500,000 WMT annually)
● Mine nickeliferous ores (laterite overburden, limonite, and saprolite) in the
25,000 hectares mineral reservation
● Sort and extract using backhoes
● Load and haul to the pre-pile yard
● Grade sampling of every truckload in the pre-pile yard
● Pre-stockpiling using wheel loaders
● Haul materials to stockyard
● Stockpiling at stockyard
● Load from stockyard then haul to LCT

Platinum Group of Metals Corporation
Cagdianao, Claver, Surigao del Norte
March 2014 – March 2016
Scope of Work
General Contractor (3,000,000 WMT annually)
● Waste Stripping
● Extraction, loading, hauling, stockpiling, beneficiation, rolling, and sun drying
● Barging, ship-loading and direct shipping of nickel ore with over 500 units
equipment fleet and close to 2,000 personnel.

Iloilo Aggregates
Libertad, Banate, Iloilo
June 2020 – Present
Scope of Work
●Mountain Quarry w/ drilling and blasting
● Aggregates Crushing and Screening
●Hauling and deliveries of finished products

Min Occ Aggregates
Sta. Lucia, Sablayan, Mindoro Occidental
Upcoming Project – 4th Quarter 2026
Scope of Work
● River Quarry
● Aggregates Crushing and Screening
● Hauling and deliveries of finished products
● Shipment of products using LCT/Barge to neighboring provinces.

Filinvest Development Corporation
Pooc, Talisay City, Cebu
January 1998 – 2002
Scope of Work
● Subcontracting works for Anseca-Acelco Ventures, Inc. in the land development, with the
removal of unsuitable materials.
● Landfilling of an approximate volume of 500,000 m3 of coralline limestone and engineer
● Filling of up to 95% – 100% compaction on a 35-hectare area by the beach.
● Construction of road network, drainage system, water line system, and sewer system
● Phase 1 – Engineered Backfilling of Spine Road to Beach Front (1998 – 2000)
● Phase 2A – Landfilling of blocks at Ph1A and Beachfront Area (2000 – 2001)
● Phase 2B – Land Development of Ph1B, Road Construction of Ph1A and land filling of Staging
Area for Model House (2001 – 2002

CEMEX Philippines
Tina-an, Naga City, Cebu
January 2002 – February 2005
Scope of Work
● Design & Construction of Empty Bag Transport System
● Road Concreting to APO Port
● Drainage System Construction to Port Area
● Design and Construction of Supply Warehouse
● Construction of APO Haulers Parking Area
● Jetty Platform Construction
● Bad Order Cement Recycling Project
● Plant-wide ACU Maintenance
● Hazard Elimination for
Limestone & Crusher
Conveyor
● Road Pavement and Perimeter
Fence Repairs
● Design and Construction of Oil
& Lubricant Warehouse
● Air Condition – Yearly
Maintenance (2001 & 2002)
● Multi-purpose Building & Site
Development Works
● Multi-purpose Building –
Children’s Playground
● Safety Hazard Elimination
Project
● Design & Construction of
Spare Parts Warehouse
● Improvement of Fire Hydrant
Pump (FM Global)
● Installation of exhaust ducting
at DOPOL Fan
● Construction of Coal &
Gypsum Containment Yard

Republic Cement – Norzagaray Plant
Bigte, Norzagaray, Bulacan
June 2012 – March 2024
Scope of Work
Quarrying of Limestone (45,000 MT per month), which includes:
● Drilling and controlled blasting
● Mechanical mining (rock breaking and splitting)
● Extraction, loading, and hauling of limestone from quarry to crusher or
designated stockpile areas
● Material handling
● Pushing and stockpiling of delivered raw materials
● Receiving and stockpiling of rice husk and other alternative fuel

ATN Philippines Solar Energy Group
Macabud, Montalban, Rizal
January 2018 – September 2019
Scope of Work
Quarrying of basalt (84,000 BCM or 120,000 CUM per month – Waste and Basalt),
including:
● Development and extraction of andesite and basalt materials
● Waste stripping, road development, drilling, blasting, loading, hauling, and
feeding of basalt material to crushing plant and designated stockpile area
● Development and maintenance of environmental protection facilities

Marcventures Mining and Development Corp.
Cabangahan, Cantilan, Surigao del Sur
April 2009
Scope of Work
General Contractor (2,000,000 WMT annually)
● Provide mining services from mine development to exploitation.
● Development of mine haul roads, drainage system, siltation
ponds, ore stockyard and waste dumps.
● Extraction, loading, hauling, stockpiling, beneficiation, rolling,
and sun drying, barging, ship-loading and direct shipping of
nickel ore.

Mina Vida de Mindanao Corporation
Sikulis, Languyan, Tawi-tawi
June 2017 – June 2020
Scope of Work
Subcontractor responsible for:
● Waste stripping
● Extraction, loading, and hauling of nickel ores
● Ship-loading of direct shipping nickel ores
● Road construction and maintenance

Arc Nickel Resources, Inc
Pintatagan, Banaybanay, Davao Oriental
January 2021 – October 2022
Scope of Work
Mine Development, which include construction of:
● Main mine haul and access roads
● Drainage system complete with siltation ponds
● Causeway and waste dumps
● Limonite and Saprolite stockyards and beneficiation yards.
● Saprolite pier yards.
● Environmental erosion & sediment control facilities such as settling ponds
● Motorpool

Pacific Cement Philippines Inc.
KM 11, Surigao City, Surigao del Norte
January 2009 – May 2014
Scope of Work
General Contractor (25,000 MT per month of Limestone, Silica, and Shale)
● Provide manpower, technical expertise, and equipment for the whole quarry
operations which include drilling, blasting, extracting, loading, and hauling of
limestone, shale, and silica for cement production.
● Mine and road maintenance
● Mine planning and design